In addition to the two identical lines (more on this in the box), Krones also supplied the syrup room, all the utilities, including a CO2 generator and a Hydronomic water treatment system with units for ultrafiltration and ozonising.
The newly built hall is dimensioned to accommodate a total of three bottling lines, with a third identical line to be installed in mid-2022. The premises also offer more space for further future expansion projects.